Interactive calculator
UPS & Battery Sizing
UPS power in W and VA, and preliminary battery energy.
EstimatePreliminary result, not a design verification.
Before you calculate
Learn more — complete guide →UPS power and preliminary battery energy
Two inputs: the critical load and the backup time. Power (W and VA) and energy are sized separately; the manufacturer runtime chart decides the real autonomy.
Step 1
Load and backup time
The expected running load of the equipment that must stay on, not the breaker rating.
Advanced: assumptions and a candidate UPS (optional)
Step 2
Results
Check before relying on this result
- Preliminary energy estimate. The real autonomy must be checked on the manufacturer's runtime chart at the actual load (short, high-rate discharges in particular do not scale with kWh).
UPS rating needed1.50 kW · 1.667 kVABoth ratings must be met; the load alone is 1333 VA.
Energy delivered to the load600 WhDrawn from the battery ≈ 667 Wh
Preliminary battery nominal energy1.042 kWhReference estimate; runtime verification required.
Rating class to investigate2.0 kVANot a recommended product: check its W rating and runtime chart.
Not covered: inrush and motor loads, crest factor, transfer behaviour, redundancy, battery voltage and BMS limits, temperature. Life-safety systems need specialist design.
1. UPS active and apparent power
The load with the sizing headroom; the apparent power uses the LOAD power factor.
2. Energy delivered to the load
The current load for the backup time. The headroom is NOT included: it sizes the UPS, not the energy.
3. Preliminary battery nominal energy
Battery-to-AC efficiency η, usable fraction u and end-of-life capacity a are design assumptions, not fixed values for a chemistry.
Calculations use full precision internally; the displayed numbers are rounded for readability.