When lightning strikes
Lightning protection limits the harm that a strike does to a structure, to the people in it and to the electrical and electronic systems inside it. The rules are in the IEC 62305 series (EN 62305). This guide explains the main ideas: the lightning current, the risk assessment, the rolling sphere method, the external system that catches the strike, and the bonding, surge protection and zones that protect the systems inside.
This is educational material. The requirements that apply to an installation come from the standards and national rules in force and from the manufacturer’s data.
What lightning protection covers
A lightning strike is a very large current, of tens to hundreds of kiloamperes, that lasts a fraction of a second. It can hit the structure directly (called S1), hit the ground next to it (S2), hit a line that enters it, such as the power cable or a metal pipe (S3), or hit the ground near such a line (S4). The standard calls these the sources of damage.
- D1: injury to people and animals from touch and step voltage.
- D2: physical damage, such as fire, explosion and mechanical effects, caused by the current and the heat of the arc.
- D3: failure of electrical and electronic systems from overvoltages.
Not every building needs a lightning protection system. Part 2 gives a risk assessment that shows whether protection is needed and at what level. The European standards are adopted in Greece as ΕΛΟΤ EN 62305. Protection against overvoltage in the installation is also covered by the wiring rules, and the protective devices of the circuits are described in the MCB guide and the RCD guide.
The lightning current
A direct strike can have a first short stroke, a series of shorter subsequent strokes and sometimes a long stroke. The standard models the first short stroke as an impulse of 10/350 µs: it reaches its peak in about 10 µs and falls to half of it after 350 µs. The surges induced by lightning that hits nearby are modelled as 8/20 µs impulses, which are much shorter.
The current acts in three ways. It heats the conductors it flows in. It produces strong mechanical forces between conductors. And it creates voltages: in loops near it by induction, and at the earth electrode, whose potential rises by the product of the current and the earth resistance.
This is why a good lightning protection system does not try to make the voltages small. It makes every metal part of the structure rise together, by bonding them, which reduces the potential differences between them and the risk of sparking, although transient voltages and step and touch hazards can remain.
Risk and protection levels
Part 2 compares the risk of loss with a tolerable value. The main one is R1, the risk of loss of human life, with the tolerable value RT = 10⁻⁵ per year (one in a hundred thousand). If R1 is higher, protection is needed. The standard also assesses the loss of service to the public (R2), of cultural heritage (R3) and of economic value (R4).
One input is the number of direct strikes per year to the structure, ND. It uses the ground flash density Ng in flashes per km² per year, the collection area Ad of the structure in m² and a location factor Cd.
The protection level LPL I to IV sets how large a lightning current the system must handle and how close the air-termination must be. Level I is the most demanding.
| Level | Peak current (kA) | Rolling sphere radius (m) | Mesh size (m) | Down-conductor spacing (m) |
|---|---|---|---|---|
| I | 200 | 20 | 5 × 5 | 10 |
| II | 150 | 30 | 10 × 10 | 10 |
| III | 100 | 45 | 15 × 15 | 15 |
| IV | 100 | 60 | 20 × 20 | 20 |
The rolling sphere radius follows from the smallest peak current I that the air-termination must intercept: r = 10 × I^0.65, with r in metres and I in kA. A current of 3 kA gives about 20 m, 5 kA about 30 m, 10 kA about 45 m and 16 kA about 60 m. A smaller radius means that weaker strikes, which could otherwise slip through between the conductors, are also intercepted. This is why the higher levels need a denser system.
The external LPS
The external lightning protection system (LPS) catches the strike, leads the current to earth and spreads it in the ground. It has three parts: the air-termination, the down conductors and the earth termination. The internal part is described in the next chapter.
- Air-termination: rods, stretched wires or a mesh of conductors on the roof. The standard places them by three methods: the rolling sphere, the mesh and the protection angle. The rolling sphere method works for any shape of structure. A conductor must be placed wherever the sphere could touch.
- Down conductors: lead the current from the air-termination to earth. Several parallel paths share the current and lower the voltage and the magnetic field. They are run as direct as possible, and a test joint in each lets the earth connection be measured.
- Earth termination: spreads the current in the ground. Two arrangements are used: type A, separate horizontal or vertical electrodes at each down conductor, and type B, a ring electrode around the structure or the foundation electrode. Type B is preferred, because it equalises the potential better. One common earth termination serves the lightning, power and telecommunications systems.
- Dimensions: the minimum dimensions of air-termination and down conductors depend on the material, the construction (round, tape or stranded), the application and the permitted exceptions. For example, a commonly specified solid-round copper conductor has a nominal cross-section of 50 mm². Check the applicable IEC/EN 62305-3 and IEC/EN 62561-2 tables before choosing the actual component.
The external system must also be kept apart from metal parts and wiring in the structure, or bonded to them, so that the current cannot jump across as a spark. The required separation distance is:
Here ki depends on the level (0.08 for level I, 0.06 for II, 0.04 for III and IV), kc on how the current divides between the down conductors (1 for a single one, less for several), km on the material between (1 for air, 0.5 for concrete or brick) and l is the length along the conductor, in metres, from the point considered to the nearest bonding point.
Bonding, SPDs and zones
The internal LPS reduces the risk of dangerous sparking inside the structure and protects the electrical and electronic systems from the surges. It has two measures that work together: equipotential bonding and surge protection.
Equipotential bonding: every metal service that enters the structure, such as water, gas and heating pipes, the building steel and the earth of the power system, is bonded at the entrance to a main bonding bar that is connected to the earth termination. Live conductors cannot be bonded directly, so they are connected through surge protective devices (SPDs), which conduct only when a surge appears.
The concept of lightning protection zones (LPZ) divides the structure by how much surge to expect. Zone 0A can be hit directly. Zone 0B cannot, but is in the full field. Inside, the zones 1, 2 and so on have a smaller and smaller surge. Where a line crosses from one zone to the next, it is bonded or fitted with an SPD.
- Type 1 SPD: tested with the 10/350 µs impulse current Iimp. It is fitted where the line enters the structure, where part of the lightning current can flow in.
- Type 2 SPD: tested with the 8/20 µs nominal discharge current In. It is fitted in the distribution boards and handles the surges that are left over or induced.
- Type 3 SPD: fitted at or near the equipment, as the last stage, for the final reduction of the surge.
An SPD is chosen by its voltage protection level Up, which must be lower than the impulse withstand voltage Uw of the equipment. In a 230/400 V installation the equipment of overvoltage category I, II, III and IV withstands 1.5, 2.5, 4 and 6 kV. The connecting conductors of the SPD must be as short as possible, because the voltage along them adds to the voltage that reaches the equipment: roughly 1 kV per metre is a common illustration for a fast surge, but the real value depends on the surge current and the geometry. The stages must be coordinated: follow the manufacturer’s data.
Designing the system
- Assess the risk. Use part 2 to see whether protection is needed and to choose the level.
- Place the air-termination. Rolling sphere, mesh or protection angle, with the radius or the mesh of the chosen level.
- Choose the down conductors and the earth termination. At the spacing of the level, with a type B earth termination and one common earthing system.
- Check the separation distance. Keep s from metal parts and wiring, or bond them.
- Bond and protect inside. Bond all services at the entrance and fit coordinated SPDs at the zone boundaries.
- Inspect and maintain. Inspect after installation, at regular intervals and after a strike, and measure the earth connections at the test joints.
The earth side of the system uses the same ideas as the protective earth. See the PE conductor guide.
Worked example
A building is 20 m long, 10 m wide and 6 m high, and stands alone (Cd = 1) where the ground flash density is assumed to be Ng = 2 flashes per km² per year. Then 3H = 18 m and the collection area is Ad = 20 × 10 + 2 × 18 × (20 + 10) + π × 18² = 200 + 1 080 + 1 018 ≈ 2 298 m².
The number of direct strikes is ND = 2 × 2 298 × 1 × 10⁻⁶ ≈ 0.0046 per year, about one strike in 218 years. This number alone does not decide anything: the full assessment of part 2 weighs it against the consequences for the people and the contents.
Suppose level II is chosen. A down conductor with a point 10 m from the nearest bonding point, kc = 1 and air between gives s = 0.06 × 1 / 1 × 10 = 0.6 m. If the space is filled with concrete or brick, km = 0.5 and the distance doubles: s = 0.06 × 1 / 0.5 × 10 = 1.2 m.
As a simplified illustration under assumed surge conditions, a Type 2 SPD with Up = 1.5 kV and category II equipment that withstands Uw = 2.5 kV may meet a simple voltage-level check. With 0.5 m of connecting conductors adding an illustrative 0.5 kV, the voltage at the equipment is about 1.5 + 0.5 = 2.0 kV, which is below 2.5 kV. Longer leads would use up the margin: the length of the connections matters as much as the Up. Whether the protection is adequate still needs a coordinated SPD design that also considers the surge duty, the supply system and the installation.